topics that matter; ideas worth sharing

share a tip, submit a link, add something new

Could your IT management skills prevent this disaster?

January 5, 2001, 12:13 PM —  CIO — 

THE STORY BROKE ON FEB. 1, 2000: the Big Dig was not just over budget, it was wildly, insanely, frighteningly and perhaps feloniously over budget. The front-page headline in the Boston Herald read: "Big Cost of Big Dig Could Grow by $1.4B."
The "B" was for billion.

People were outraged; no one was surprised.

The Big Dig has been a fact of Boston life for almost a decade. Since ground was first broken in 1991, the city has been torn up, dug up and burrowed under. The Central Artery/Tunnel Project (the Big Dig's official name) was designed to replace the old six-lane, 1.5-mile elevated Central Artery. When it opened in 1959, the Artery was supposed to accommodate 75,000 vehicles a day. Today, more than 190,000 motorists from Boston's northern and southern suburbs sit in hellish traffic for up to 10 hours, Monday through Friday.

When the Big Dig is completed (target date: 2004), the elevated highway that has divided neighborhoods, scarred the city and hidden the waterfront for over 40 years will be gone, replaced by an eight-to-10-lane expressway running beneath the streets of Boston. There will also be a tunnel underneath the Fort Point Channel, another beneath Boston Harbor, two bridges over the Charles River, and 27 acres of public and commercial space where the Artery once stood.

Throughout the '90s, as Boston watched the tall cranes gather and the deep holes grow, it was obvious that an enormous amount of money was being spent. Back in 1982, Massachusetts politicians (most famously House Speaker Thomas P. "Tip" O'Neil) lowballed the estimated cost of the project to secure funding through the federal Surface Transportation and Technical Corrections Act. The politicians said it would cost $2.2 billion. Today, the price tag is $14.1 billion -- most of it coming out of taxpayers' wallets -- and climbing.

Of course, that $14 billion pays for a lot. The Dig is the largest and most technologically complex public works project in U.S. history -- bigger than the Panama Canal or the Hoover Dam. In the course of the Big Dig:

  • 200 separate construction and design contracts will be awarded.
  • 161 lane miles of highway are being laid in a 7.5-mile corridor.
  • 15 million cubic yards of dirt and 2.5 million cubic yards of clay are being dug up and replaced with enough concrete (3.8 million cubic yards) to build a sidewalk 3 feet wide and 4 inches thick from Boston to San Francisco and back three times.
  • 29 miles of gas, electric, telephone, sewer, water lines and other utility lines (maintained by 31 different companies) are being rerouted.
  • 4,800 trees and 33,000 shrubs will be planted.
  • A tunnel is being constructed 120 feet below street level; in some areas it is just 3 feet below an existing subway tube.
  • A casting basin big enough to hold three Titanics was built by draining a portion of the Fort Point Channel to create a dry environment in which to construct the tunnel; then the basin was flooded to

I like it!
Post a comment
The content of this field is kept private and will not be shown publicly.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.
Resources
White Paper

Symantec Backup Exec 12 and Backup Exec System Recovery 8 deliver industry leading Windows data protection and system recovery. Download this whitepaper to find out the top reasons to upgrade and how to get continuous data protection and complete system recovery.

Webcast

Data and system loss — from a hard drive failure, malicious attack, natural disaster, or simple human error — can happen anytime. Don’t leave your business vulnerable. Make sure you have a secure recovery strategy in place. Symantec's latest backup and system recovery technology can efficiently restore critical applications, individual emails and documents and even restore your entire system in minutes in the event of a loss.

White Paper

Businesses face a growing challenge to ensure that the IT environment is properly protected. Backup Exec 12 integrates with other applications in the Symantec family of products, to complement your current data protection strategy, keep your data securely backed up and make it recoverable when you need it most.

Free stuff
Featured Sponsor

Get a broad understanding of important regulations and how you can make sure your site is in adherence.





Learn how VeriSign SGC-enabled SSL Certificates can help improve site security and customer confidence in the free white paper, "How to Offer the Strongest SSL Encryption." In this paper you will learn the differences between weak and strong encryption and what they mean for your site's performance.

Get VeriSign's free white paper: "The Latest Advancements in SSL Technology" and learn about the benefits of strong SSL encryption, Extended Validation (EV) SSL and security trust marks and what these SSL offerings can do for your site.

Now with Extended Validation (EV) SSL available from VeriSign, you can show your customers that they can trust your site. Learn about EV SSL benefits in this free VeriSign white paper.

More Resources