Reducing your cable mess

1 comment | 19I like it!
June 25, 2008, 07:56 PM — 

It doesn't take many years for the cabling in a moderately sized server room to become a maintenance nightmare. Some racks I've worked with have become so full of network cabling and power cords that it is nearly impossible to reach inside and push a power switch, never mind insert a new network or console cable. Having gone through an exercise in pulling out hundreds of installed yet unused cabling in order to rearrange the contents of a series of computer racks, I can tell you from the perspective of hindsight that some basic rules for managing your cable plant can save you a lot of time in the long-run.

Rule one: Label, label, label! There is nothing more time-consuming and frustrating than having to manually trace one cable out of dozens all bundled together to figure out what the other end is plugged into. A scheme whereby each cable is labeled at both ends to indicate what it connects to can save you hours of time. If ultraviolet is plugged into port 11 on switch 4-4, the switch end of the cable should be labeled "ultraviolet" and the system end should be labeled "4-4:11". Better yet, both ends should be labeled with both pieces of information. If you have to move a cable out of the way for some reason, it will be easy to know where to plug it back in when you're done.

Some cable providers will be very happy to prepare cables for you with any type of labeling you want. You can also purchase a labeler for a modest fee. With my factory refurbished brother P-touch, I can print labels up to 1" in height and in four different colors (depending on the cartridge I use, of course), thus providing extremely useful documentation of my wiring.

Rule two: Use cables that are close to the length you need. If all you have are very long cables, you will end up with lots of long cables that get in your way when you're working in your racks or you will tie your cables into bundles to keep them neat, thereby making the job of tracing cables from one end to the other that much harder. This rule applies to power cables almost as much as network cables. If a system is plugging into a power strip that's one foot away, don't use the longest power cable you have on hand. Unfortunately, what you're going to have on hand are likely to be standard length cables, but you can get 1-3 foot cables for around $2-2.50.

It's also a good idea to categorize cables that you remove from racks for later reuse both by type (cat5, cat6, crossover, console) and approximate length. I have found a fast and easy way to measure cable lengths before I bundle them up and add them to my supply cabinet. The arm on my desk is four feet long. I hold up each cable and count off how many four-foot lengths it comprises end to end. I don't bother being too precise, but I won't end up grabbing a 16 foot cable sometime down the line when a 4 foot cable would do.

Sign up for ITworld's Daily newsletter
Follow ITworld on Twitter @IT_world

I like it!
Comments

I woulds say great rules and

I woulds say great rules and tips for saving our a lot of time as cost as well rule 4 and rule 5 more convenient for me.
Florida Cable company


| reply
peer-to-peer

jfruh
Apple syncing patent can't come soon enough

pasmith
New Twitter features borrow from 3rd party clients

Esther Schindler
Open Source Changes the Software Acquisition Process

mikelgan
How to set up continuous podcast play on the new iTunes

David Strom
Five important Windows 7 mobility features

sjvn
Guard your Wi-Fi for your own sake                        

Sandra Henry-Stocker
Grepping on Whole Words

 

Sidekick: The Good News & the Bad News
Either way you look at it Microsoft Data Center management did not follow standards or best practices in this failure. In which case it makes me wonder more about the outsourcing of corporate data much less personal data.
- mburton325

Join the conversation here

The Daily Tip

The Daily TipQuick, practical advice for IT pros. Made fresh daily.

Hot tips:

Want to cash in on your IT savvy? Send your tip to tips@itworld.com. If we post it, we'll send you a $25 Amazon e-gift card.

Newsletters

Subscribe to ITWORLD TODAY and receive the latest IT news and analysis.

I would like to receive offers via email from ITworld partners.
By clicking submit you agree to the terms and conditions outlined in ITworld's privacy policy.
Featured Sponsor

AISO founders envisioned a Web hosting company that was environmentally friendly. While the company employed energy-efficient innovations like solar panels, its infrastructure produced unacceptable power and cooling requirements. Find out how AISO leveraged AMD technology to overcome their challenge in this case study white paper.

In this whitepaper, Scalar explores the opportunity to change the landscape with respect to mission critical databases built around Oracle. Leveraging technologies such as Linux, high-end commodity processing power and Oracle RAC technology to architect, design, build and maintain database infrastructure that delivers maximum availability, reliability and performance at a fraction of traditional cost.

On a typical day, weather.com, the Web site for The Weather Channel in Atlanta, serves up between 15 million and 20 million page views. But in September 2004, when back-to-back hurricanes ransacked Florida, the peak traffic on one day more than tripled: over 70 million page views by more than 7 million unique visitors. Read the full success story now.

Marketplace