Changes to OOXML draft standard waved through
About four-fifths of the proposed changes to a draft standard for the OOXML
document format were waved through, undiscussed, at the conclusion of a weeklong
meeting in Geneva.
If the specification for the Office Open XML file format is adopted as a standard
in its current form, "there are likely to be hundreds of defects,"
said the head of the U.S. delegation at the meeting, Frank Farance.
OOXML, the default document format in Microsoft Office 2007, has already fallen
at one hurdle on the route to becoming an international standard. Members of
Joint Technical Committee 1 of the International Organization for Standardization
(ISO) and the International Electrotechnical Commission (IEC) rejected it in
a vote last September. National standards bodies participating in the vote made
3,500 comments suggesting improvements to the draft.
At this week's ballot resolution meeting (BRM) in Geneva, the sponsor of the
draft standard, industry consortium ECMA International, presented 1,100 recommendations
for changes to the draft.
However, delegates only had time to discuss and modify around 20 percent of
those, said Farance, an industry consultant with expertise in standards issues.
"Virtually every comment we processed did not survive unedited,"
he said.
The 80 percent of comments that were not discussed during the meeting were
put to a "default vote," resulting in the automatic adoption of ECMA's
recommendations without modification by delegates, he said.
Farance questioned why the meeting's business had to be rushed.
"I see no particular rationale for why we were limited in time. I don't
know how you can deal with 6,000 pages with 3,500 comments in a week. It's like
trying to run a two-minute mile," he said.
Andy Updegrove, a Boston lawyer who works with industry consortia on technical
standards, described the meeting process as unsuccessful.
"Hopefully, the national bodies will not compound this error by approving
a clearly unfinished specification during the voting period ahead," he
said.
Although not a delegate to the BRM, Updegrove had spent the week in Geneva
at the meeting venue. He said he had heard from people within the meeting that
only six countries had voted in favor of adopting the undiscussed recommendations.
Representatives for ISO and IEC could not be reached as the meeting ended.
Now that the ballot resolution meeting is over, the 87 national standards bodies
that voted in last September's ballot have 30 days to vote on the revised draft.
That ballot concludes March 29.
IDG News Service
Sign up for ITworld's Daily newsletter
Follow ITworld on Twitter @IT_world
jfruh
Apple syncing patent can't come soon enough
pasmith
New Twitter features borrow from 3rd party clients
Esther Schindler
Open Source Changes the Software Acquisition Process
mikelgan
How to set up continuous podcast play on the new iTunes
David Strom
Five important Windows 7 mobility features
sjvn
Guard your Wi-Fi for your own sake
Sandra Henry-Stocker
Grepping on Whole Words
Sidekick: The Good News & the Bad News
Either way you look at it Microsoft Data Center management did not follow standards or best practices in this failure. In which case it makes me wonder more about the outsourcing of corporate data much less personal data.
- mburton325
Join the conversation here
Quick, practical advice for IT pros. Made fresh daily.
Want to cash in on your IT savvy? Send your tip to tips@itworld.com. If we post it, we'll send you a $25 Amazon e-gift card.












